5th Floor, Sunny Mart, Mansarovar, Jaipur
+91 90570 12222

High-Rise Building Construction Company in Jaipur, built to your possession date.

Residential towers from G+7 to G+19, twin towers and gated communities, civil-only to full turnkey. Built by our own engineers and RCC crews.

Nital, G+19 residential towers on Ajmer Road, Jaipur Under construction
Nital · G+197,67,000 sq. ft. · Ajmer Road, Jaipur
Nital · G+19
Utpal Apartments, Mansarovar, Jaipur, delivered by Dhinwa Construction Delivered
Utpal Apartments3,62,000 sq. ft. · turnkey · handed over
Utpal Apartments
Dhinwa at a glance

Numbers, not adjectives.

12.40L
sq. ft. delivered
38.87L
sq. ft. under development
17+
landmark projects
51L
Sq.ft. overall portfolio
Communities we're proud to build
VP
V Park, Sirsi Road8,06,813 sq. ft. · under construction
NT
Nital, Ajmer RoadG+19 · under construction
JP
J Park, MansarovarTwin towers · under construction
UT
Utpal Apartments3,62,000 sq. ft. · delivered
GH
Govardhan Heights4,53,000 sq. ft. · delivered
AR
Aamor Residences3,05,000 sq. ft. · delivered
The residential difference

Sold before it's built.

Your buyers have paid for homes that don't exist yet, against the possession date you registered with RERA. Every slab that runs late pushes that date — and if your payment plan is construction-linked, it holds back buyer instalments too.

So we plan backwards from one date: the day you hand over keys.
POSSESSION DATE SLAB 1 · CAST ON PROGRAMME SLAB 2 · CAST ON PROGRAMME SLAB 3 · CAST ON PROGRAMME SLAB 4 · NEXT SLAB 5 TERRACE
Cast on programmeStill to come
Four things developers worry about

What goes wrong, and what we do about it.

01
“The possession date slips, and buyers start calling.”The worry
Programme locked before we mobilise.

Built back from your possession date, not adjusted after delays begin.

02
“The structure gets handed to a sub-contractor.”The worry
Our own RCC crews.

Our own engineers and formwork teams execute the frame, foundation to terrace.

03
“Flat 702 doesn't look like the model flat.”The worry
Model flat first, then every flat.

Finishing is benchmarked on the model flat before bulk work, then tracked floor by floor.

04
“I only hear about problems after they cost me.”The worry
Weekly report, daily photos.

If the programme slips, you hear it from us first.

Residential towers we've handed over

Three towers, handed over in Jaipur.

Over 11 lakh sq. ft. of homes, delivered and lived in.

DeliveredUtpal Apartments, Mansarovar, Jaipur

Utpal Apartments

Mansarovar, Jaipur

3,62,000SQ. FT.
  • Turnkey
  • Structural RCC
  • MEP
  • Finishing
DeliveredGovardhan Heights, Jaisinghpura, Jaipur

Govardhan Heights

Jaisinghpura, Jaipur

4,53,000SQ. FT.
  • Civil
  • Structural RCC
  • Finishing
DeliveredAamor Residences, Mansarovar, Jaipur

Aamor Residences

Mansarovar, Jaipur

3,05,000SQ. FT.
  • Design & build
  • Structural RCC
  • MEP
  • Finishing
What we build

Residential towers, twin towers and gated communities.

01

G+7 to G+19 residential towers

RCC frame, formwork and a floor-by-floor programme, from foundation to terrace.

  • RCC frame
  • Formwork
  • Floor-wise QC
Nital G+19 towers under construction
Our projectNital · G+19 · under construction
02

Twin towers in parallel

Two towers rising together under one site team, with shared plant and one coordinated programme.

  • One site team
  • Shared plant
  • One programme
J Park twin towers rising in parallel, Mansarovar
Our projectJ Park · twin towers in parallel
03

Multi-block gated communities

Several blocks, amenities and external works run as one programme, with one quality and safety system.

  • Multiple blocks
  • Amenities
  • External works
V Park gated community, Sirsi Road, Jaipur
Our projectV Park · 8,06,813 sq. ft.
04

Turnkey residential (EPC)

Design, structure, MEP, finishing and external development under one contract, from drawings to handover.

  • Design
  • Structure
  • MEP
  • Handover
Utpal Apartments, delivered turnkey
DeliveredUtpal · turnkey execution
05

Civil + structure (contractor model)

RCC and civil works only, working alongside your own finishing teams.

  • Civil
  • Structural RCC
Govardhan Heights, Jaisinghpura
DeliveredGovardhan Heights · civil, RCC, finishing
06

Finishing & model flats

The model flat is benchmarked before bulk finishing, then quality is tracked across every unit.

  • Model flat
  • Floor-wise snagging
Utpal sample flat living room
Our projectUtpal · sample flat
01 / 06
Under construction

Four communities, rising right now.

V Park towers, Sirsi Road, Jaipur
8,06,813sq. ft.

V Park

Sirsi Road · design to handover

Nital, Ajmer Road, Jaipur
7,67,000sq. ft.

Nital

Ajmer Road · G+19 · turnkey

J Park under construction, Mansarovar
6,40,000sq. ft.

J Park

Mansarovar · twin towers in parallel

J Club steel frame under construction
36,000sq. ft.

J Club

Clubhouse · civil and interior fit-out

From our sites

Real sites. Real crews. Jaipur.

V Park towers rising, Sirsi Road
V Park, Sirsi Road
RCC frame and formwork on a Dhinwa site
RCC frame & formwork
J Park structure, Mansarovar
J Park, Mansarovar
Govardhan Heights under construction
Govardhan Heights
Aamor Residences, Mansarovar
Aamor Residences
How you stay in control

You never chase us for a status.

Weekly progress report

Floor-by-floor status against the locked programme.

Daily site photography

Every pour, every floor, without a site visit.

Documented quality

ISO 9001 systems, on-site cube testing, daily QC checklists.

Visit a live site

Walk a running tower before you decide.

Exploring partners?

The first conversation costs you nothing.

An honest read on whether your possession date is achievable, whether you hire us or not.

  1. 01

    Share three things

    Plot location, built-up area, and your possession date. We reply within one working day.

  2. 02

    Plot visit & drawing review

    We walk the plot and go through your drawings, towers and phasing.

  3. 03

    Programme & scope proposal

    A programme built back from your possession date, with a clear scope split. You decide from there.

Independently certified

Checked by others, not just by us.

Dhinwa Construction ISO certificate
Dhinwa Construction ISO certificate
Dhinwa Construction ISO certificate
ISO 9001:2015ISO 45001:2018ISO 14001:2015Class AA RHB, Rajasthan
Nirwan University campus building, Bassi
Nirwan University, Bassi
In their words

Repeat clients say it best.

I initially started with just one project with them, and seeing their commitment to quality, and speed of development, we are now working together on multiple projects.

Dr. S.L. SihaagChairman, Nirwan InstitutionsRepeat client

“The way they kept everything transparent, stayed organized, and delivered as promised made the entire journey smooth and stress-free.”

Mr. Sourabh SharmaPartner, Hotel C-Scheme JaipurDelivered
Straight answers

Questions before you sign.

In Jaipur, residential projects from 50,000 sq. ft. of built-up area. Elsewhere in Rajasthan, from 1,00,000 sq. ft.

No. Our own engineers and formwork teams execute the frame, foundation to terrace.

Yes. At J Park we are building twin towers in parallel under one site team, with shared plant and one programme.

Either. We work as turnkey (EPC), design & build, civil construction, finishing works or project management. The model is agreed before we mobilise.

The model flat is benchmarked before bulk finishing begins, finishing is tracked floor by floor, and snagging is closed floor by floor rather than in one final sweep.

A weekly progress report and daily site photography, plus a walk-through of any running site whenever you ask.

Got a possession date? Let's see if it holds.

Pick the step that suits where you are today.

ISO 9001 · ISO 45001 · ISO 14001 · Class AA RHB · Jaipur since 2018