5th Floor, Sunny Mart, Mansarovar, Jaipur
+91 90570 12222

Commercial Construction Company in Jaipur, built to your leasing date.

Offices, retail and mixed-use buildings, civil to finishing under one contract. Built by our own engineers and RCC crews.

Hotel in Malviya Nagar, Jaipur, delivered by Dhinwa Construction Delivered
Hotel, Malviya Nagar60,000 sq. ft. · structure to interior fit-out
Hotel, Malviya Nagar
Hotel in C-Scheme, Jaipur, delivered by Dhinwa Construction Delivered
Hotel, C-Scheme60,000 sq. ft. · structure, plaster, finishing
Hotel, C-Scheme
Dhinwa at a glance

Numbers, not adjectives.

12.40L
sq. ft. delivered
38.87L
sq. ft. under development
51.27L
sq. ft. overall portfolio
17
landmark projects
Clients we're proud to build for
NU
Nirwan UniversityMedical college, hospital, hostels
JNU
Jaipur National UniversityAdmin block, hostels, maternity block
HC
Hotel C-Scheme60,000 sq. ft. · delivered
HM
Hotel Malviya Nagar60,000 sq. ft. · delivered
IIFT
IIFT Block, Jagatpura2,35,000 sq. ft. · basement + G+9
VP
V Park, Sirsi Road8,06,813 sq. ft. · under construction
The commercial difference

Leased by the month, not sold by the square foot.

Every late week is rent you don't collect. A commercial building is finished when a tenant can move in, not when the structure tops out.

So we ask one question first: when must your first tenant move in?
FLOOR 1 · TENANT FIT-OUT FLOOR 2 · TENANT FIT-OUT FLOOR 3 · MEP & FINISHING FLOOR 4 · MEP & FINISHING FLOOR 5 · RCC FLOOR 6 · RCC
Handed to tenantsStill being built
Four things developers worry about

What goes wrong, and what we do about it.

01
“The handover date moves, and the first tenant walks.”The worry
Programme built backwards from possession.

We plan everything to the date your first tenant moves in.

02
“The structure gets handed to a sub-contractor.”The worry
Our own RCC crews.

Own engineers, in-house M40 batching, own formwork teams.

03
“I only hear about problems after they cost me.”The worry
Weekly report, daily photos.

If a floor cycle slips, you hear it slipped.

04
“Completion paperwork holds up occupancy.”The worry
Documents tracked from day one.

Fire NOC, lift and test records run as milestones.

Commercial buildings we've delivered

Two hotels, handed over in Jaipur.

A hotel is a commercial building with the least forgiving opening date.

DeliveredHotel Malviya Nagar, Jaipur

Hotel, Malviya Nagar

Malviya Nagar, Jaipur

60,000SQ. FT.
  • Structure
  • Plaster
  • Finishing
  • Interior fit-out
DeliveredHotel C-Scheme, Jaipur

Hotel, C-Scheme

C-Scheme, Jaipur

60,000SQ. FT.
  • Structure
  • Plaster
  • Finishing

The way they kept everything transparent, stayed organized, and delivered as promised made the entire journey smooth and stress-free.

Mr. Sourabh SharmaPartner, Hotel C-Scheme Jaipur
What we build

Office, retail and mixed-use construction in Jaipur.

01

Corporate & multi-tenant offices

Efficient floor plates, lift and stair cores, and risers sized for tenant fit-outs.

  • Floor plates
  • Cores & risers
  • Tenant-ready services
Admin Building, Jaipur National University
Closest referenceAdmin Building, JNU · 2,00,000 sq. ft.
02

Hotels & hospitality

Guest floors, lobbies and back-of-house built to an opening date, with fit-out in the same contract.

  • Structure
  • Finishing
  • Interior fit-out
Hotel C-Scheme
DeliveredHotel C-Scheme · 60,000 sq. ft.
03

Retail complexes & showrooms

Large-span floors, double-height frontage and shutter-ready shells for brand fit-outs.

  • Large spans
  • Frontage
  • Shell & core
Street-front commercial frontage in Jaipur
Retail frontageWalk a comparable building with us, on site
04

Mixed-use developments

Retail, office and residential or hospitality on one plot, each with its own access and services.

  • Separate access
  • Shared podium
  • Phased handover
V Park, residential and commercial development, Sirsi Road
Our projectV Park · residential + commercial, Sirsi Road
05

Basements & parking

Shoring, dewatering, ramps, ventilation and fire provisions, sequenced so the superstructure never waits.

  • Shoring
  • Dewatering
  • Ramps
IIFT Block, Jagatpura
Closest referenceIIFT Block · basement + G+9
06

Clubs, co-working & amenity blocks

Smaller commercial buildings held to the same finish standard as our towers.

  • Planning
  • Civil
  • Interior fit-out
J Club, Jaipur
Our projectJ Club · 36,000 sq. ft.
01 / 06
Track record

Large buildings, several at once.

IIFT Block, Jagatpura
2,35,000sq. ft.

IIFT Block

Jagatpura · Basement + G+9 · Institutional

Hostel Building, Nirwan University
2,60,000sq. ft.

Hostel Building, Nirwan

Bassi · EPC · Institutional

Hospital Building, Nirwan University
1,50,000sq. ft.

Hospital Building, Nirwan

Bassi · Healthcare

J Club steel frame under construction
36,000sq. ft.

J Club

Planning, civil, interior fit-out

From our sites

Real sites. Real crews. Jaipur.

Towers under construction by Dhinwa in Jaipur
Turnkey Construction, Jaipur
RCC frame and tower crane on a Dhinwa site
RCC frame & tower crane
J Club steel structure under construction
J Club steel frame
Structural RCC work on a Dhinwa site
Structural RCC
University campus buildings under construction
Campus construction, Bassi
How you stay in control

You never chase us for a status.

Weekly progress report

Floor-by-floor status against the locked programme.

Daily site photography

Every pour, every floor, without a site visit.

Documented quality

ISO 9001 systems, on-site CTM testing, daily QC checklists.

Visit a live site

Walk a running building before you decide.

Exploring partners?

The first conversation costs you nothing.

An honest read on whether your date is achievable, whether you hire us or not.

  1. 01

    Share three things

    Plot location, built-up area, and your first possession date. We reply within one working day.

  2. 02

    Plot visit & drawing review

    We walk the plot and check floor plates, cores, parking and fire provisions.

  3. 03

    Programme & scope proposal

    A programme built back from your date, with a clear scope split. You decide from there.

Independently certified

Checked by others, not just by us.

Dhinwa Construction ISO certificate
Dhinwa Construction ISO certificate
Dhinwa Construction ISO certificate
ISO 9001:2015ISO 45001:2018ISO 14001:2015Class AA RHB, Rajasthan
Nirwan University campus building, Bassi
Nirwan University, Bassi
In their words

Repeat clients say it best.

I initially started with just one project with them, and seeing their commitment to quality, and speed of development, we are now working together on multiple projects.

Dr. S.L. SihaagChairman, Nirwan InstitutionsRepeat client

“Their clarity, integrity, and mutual respect make them a vendor's ideal client — consistent, fair, and committed.”

Mr. Vikram AgarwalFounder, OM ManglamSupplier
Straight answers

Questions before you sign.

Yes. We delivered two 60,000 sq. ft. hotels in Jaipur, at C-Scheme and Malviya Nagar, and build large institutional and healthcare buildings, including the IIFT Block (basement + G+9).

With planning, yes. Separate access, hoist allocation and dust and noise control are set in advance.

Both. We agree the handover condition before we mobilise. On Hotel Malviya Nagar our scope ran through interior fit-out.

No. Our own engineers, batching plant and formwork teams execute the frame.

Yes. Tell us when suits you and we'll arrange a walk-through of a live site.

Developments above 1,00,000 sq. ft. of built-up area, in Jaipur and the surrounding districts.

Got a leasing date? Let's see if it holds.

Pick the step that suits where you are today.

ISO 9001 · ISO 45001 · ISO 14001 · Class AA RHB · Jaipur since 2018